Repair project
Millbrook spring replacement
Both torsion springs replaced as a matched pair, with new lift cables fitted on the same visit, in 48 minutes flat.
- Location
- Millbrook
- Work
- Matched torsion spring pair, new cables
- Time on site
- 48 minutes
- Completed
- Aug 14, 2026


Matched torsion pair, new cables · 48 min
Slide to compare









